Modern societies continue to find more uses for sod. Thousands of acres are currently under sod grass in the United States because of demand that grows every day. Both domestic and commercial users continue to buy and install this product in large quantities. It takes some skills to be able to install the product properly on a piece of land. That is why whenever in need of sod installation Jupiter FL ought to be the first place to visit.
Sod installation is not an isolated process like it may sound. It starts with proper surface preparation. The final product is highly dependent on how the surface was prepared before the grass was laid down. One should do some tests on the soil to ensure that it is of the right quality. If not, one may need to introduce soil with the right properties before planting.
All debris and materials exceeding 2-3 inches in diameter must be removed during site preparation. Wood, stumps, rocks, stones, and bricks are among materials that need to be removed. Drainage problems can be eliminated by rough grading. The land should be made to slope away from human and animal occupied structures such as houses.
Grading can be done using tractor-mounted equipment or with hand-held tools. The soil should then be sprayed with appropriate herbicides and fertilizer. Herbicides kills weed seeds that would otherwise have started germinating immediately after installing the grass. Top soil must be added to a depth of 15 centimeters after the surface has been firmed. Top soil should be clay loam, loam, sandy clay loam, loamy sand, sandy loam of any other kind of suitable soil.
The soil must be at the correct level of acidity or alkalinity. This can be ensured by taking the pH value. Lime can be added to reduce acidity while gypsum or sulfur can be added to reduce alkalinity. For the best results, the pH value should range between 6.2 and 7.2 on the pH scale. Local soil experts or the supplier of turf can be consulted on the right level of pH.
The area to be planted must be measured and the dimensions noted down. This will help to avoid buying excess or insufficient turf. A sketch should be made with dimensions indicated on it. The sketch must also show features within the area including natural and man-made ones.
The day for delivery of turf must be made after all preparations are finished. It is often recommendable to install the sod the same day it arrives to allow for strong beginning of the lawn. The grass should then be installed in a systematic manner, covering all areas. There must be no patches within the lawn after installation.
Water must be applied immediately after installation. The grass needs water and contact with soil after it is laid down in order to survive. Walking over the grass after planting should be avoided. If stacks remain uninstalled, they must be placed in a cool location for later use.
Sod installation is not an isolated process like it may sound. It starts with proper surface preparation. The final product is highly dependent on how the surface was prepared before the grass was laid down. One should do some tests on the soil to ensure that it is of the right quality. If not, one may need to introduce soil with the right properties before planting.
All debris and materials exceeding 2-3 inches in diameter must be removed during site preparation. Wood, stumps, rocks, stones, and bricks are among materials that need to be removed. Drainage problems can be eliminated by rough grading. The land should be made to slope away from human and animal occupied structures such as houses.
Grading can be done using tractor-mounted equipment or with hand-held tools. The soil should then be sprayed with appropriate herbicides and fertilizer. Herbicides kills weed seeds that would otherwise have started germinating immediately after installing the grass. Top soil must be added to a depth of 15 centimeters after the surface has been firmed. Top soil should be clay loam, loam, sandy clay loam, loamy sand, sandy loam of any other kind of suitable soil.
The soil must be at the correct level of acidity or alkalinity. This can be ensured by taking the pH value. Lime can be added to reduce acidity while gypsum or sulfur can be added to reduce alkalinity. For the best results, the pH value should range between 6.2 and 7.2 on the pH scale. Local soil experts or the supplier of turf can be consulted on the right level of pH.
The area to be planted must be measured and the dimensions noted down. This will help to avoid buying excess or insufficient turf. A sketch should be made with dimensions indicated on it. The sketch must also show features within the area including natural and man-made ones.
The day for delivery of turf must be made after all preparations are finished. It is often recommendable to install the sod the same day it arrives to allow for strong beginning of the lawn. The grass should then be installed in a systematic manner, covering all areas. There must be no patches within the lawn after installation.
Water must be applied immediately after installation. The grass needs water and contact with soil after it is laid down in order to survive. Walking over the grass after planting should be avoided. If stacks remain uninstalled, they must be placed in a cool location for later use.
About the Author:
When you are searching for the facts about sod installation Jupiter FL residents can go to our web pages online here today. More details are available at http://landscapingfieldofdreams.com now.
No comments: